Early learning Centres – Scope of work

Stage 1 & 2

  • Remove existing surfacing at both centres and dispose
  • Install new 20mm Grey wet Rubber Pour Bike Track (stage 1 and 2)
  • Install line markings for both bike tracks
  • Install sensory path connecting bike track
  • Install dark blue and light blue cloud/wave design wet rubber pour around sandpits
  • Install red play area with soft fall underneath
  • Restore all the wooden structures
  • Supply and install 35mm Luxury turf
  • Install WPC edging throughout the landscape
  • Top up the sandpits

Stage 3 & 4

  • Install wet rubber pour underneath of Forpark play equipment with soft fall base
  • Install bike track with the sensory path
  • Install 35mm Luxury turf
  • Install terracotta wet pour rubber with soft fall underneath
  • Install dry river bed, hand pump, drainage and water connection
  • Supply and install self-watering planter box, plants, mulch
  • Safety fence throughout
  • Supply compliance certification