QUEENSLAND PACIFIC PINES
Early learning Centres – Scope of work
Stage 1 & 2
- Remove existing surfacing at both centres and dispose
- Install new 20mm Grey wet Rubber Pour Bike Track (stage 1 and 2)
- Install line markings for both bike tracks
- Install sensory path connecting bike track
- Install dark blue and light blue cloud/wave design wet rubber pour around sandpits
- Install red play area with soft fall underneath
- Restore all the wooden structures
- Supply and install 35mm Luxury turf
- Install WPC edging throughout the landscape
- Top up the sandpits
Stage 3 & 4
- Install wet rubber pour underneath of Forpark play equipment with soft fall base
- Install bike track with the sensory path
- Install 35mm Luxury turf
- Install terracotta wet pour rubber with soft fall underneath
- Install dry river bed, hand pump, drainage and water connection
- Supply and install self-watering planter box, plants, mulch
- Safety fence throughout
- Supply compliance certification